41 Best Project Management Software and Tools (2020 Update)
Looking for the best project management software for your company? You’re in luck! We’ve made the task easier and combined 41 project software and tools in one comprehensive list.
Check out the tools’ top features, pricing, and what’s special about them – and find a solution fit for your business.
1. Scoro
Scoro is a comprehensive solution that combines all the features you might need in project management software: projects & tasks, contact management, quotes, team collaboration, billing, and reporting.
Top features:
- Projects with sub-tasks and deadlines
- Real-time KPI dashboard
- Shared team calendar & meeting scheduling
- Contact management
- Time tracking and billing for work
- Detailed reports on project progress and finances
- Quoting and invoicing with pre-set templates
What’s special about this tool: Scoro helps to streamline your entire work progress, so you don’t need to use a lot of different tools for every task. All your important information is stored in one central place.
Pricing: From $26 user/month
Try Scoro for free for 14 days
2. ProofHub
ProofHub offers a replacement for conventional emailing and a bunch of other tools, integrating multiple project management features under one roof.
Top features:
- Assigned user roles
- Online team discussions and chats
- Task delegating and assignments
- Reporting and tracking project history
- Secure file storage
What’s special about this tool: ProofHub has a simple and well-designed user interface that helps the team to collaborate more efficiently.
Pricing: From $20/month (up to 10 projects) to $150/month (unlimited projects)
3. Basecamp
Basecamp is the preferred tool for thousands of project management teams, who enjoy its modern social media-like interface and carefree team collaboration features.
Top features:
- Projects to manage multiple users’ work
- Message boards for discussing new projects or ideas
- In-app collaboration with the team
- Reporting on project performance
- Separate dashboard for showing to clients
- Email and desktop notifications
What’s special about this tool: Basecamp is free for teachers and students!
Price: $99/month for unlimited users
Read on: Basecamp Alternative for Project Management and Collaboration
4. Asana
Asana combines elements of project management, file storage, and collaboration and helps to manage projects across a team without email.
Top features:
- Break your work down into tasks, and assign it to team members
- Organize your tasks into projects for roadmaps and timelines
- Review milestones, and check on your team’s progress
- Get notified about projects updates
- Use project dashboards to get a quick overview
What’s special about this tool: Asana is a really easy-to-use tool with a simplistic layout. If you’re a small team with not too complex projects, check it out.
Pricing: Free for up to 15 members, Premium from $8.33 user/month
Check out this Asana alternative!
5. Podio
Podio is a flexible and highly customizable online hub for work and team communication.
Top features:
- Assign tasks, attach files and discuss details within the solution
- Share encrypted & large files
- Automate the sales pipelines, project budget tracking, and more
- Get an overview of the company with visual dashboards
- Automate your workflows
What’s special about this tool: Podio’s workflows feature enables you to add if-this-then-that logic to Podio apps. For example, instruct your app to create a task or comment, when an item is created or when a particular update is made to an item.
Pricing: From 24$ month/user for a full suite of features
6. Workzone
Workzone was built by experienced ad execs who wanted to help agencies and creative teams get visibility into all of their work.
Top features:
- Personalized, individual to-do lists
- Create subtasks and task dependencies
- Set permissions for certain users (including clients) to access projects, tasks and files
- Quickly see statuses with Gantt charts
- Assign people to more than one task
What’s special about this tool: Workzone has a lot of powerful features but is simpler to use than more complex tools. Workzone is meant for the whole team to use.
Pricing: $24-$44 per month
7. JIRA
JIRA is a cross-platform issue and bug tracking software with advanced project management capabilities and features.
Top features:
- Create user stories and issues, plan sprints
- Distribute tasks across your software team.
- Prioritize and discuss your team’s work
- Centralize your team communication
- See real-time reporting on your team’s work
What’s special about this tool: JIRA is designed for software development teams, making it the perfect IT project management tool.
Pricing: Starting from $10/month (up to 10 users), $75/month for 15 users, $300/month for 50 users.
8. Notion
Notion will give you a completely different take on project management. It helps to plan and discuss projects, share everything with the team, and keep track of all the ideas.
Top features:
- Keep a personal weekly checklist
- Take notes
- Build a task board with flexible drag and drop editor
- Share files
- Nest pages inside each other – like an infinite knowledge base
What’s special about this tool: “Notion is like the LEGO set for collaboration software (or Minecraft, if you are from a younger generation). It lets you assemble workflows that work best for your team, as easy as using a text editor.” – Ivan Zhao, Co-founder of Notion
Pricing: $8 user/month
9. Trello
Trello is known for visualizing project tasks on a cardboard-like dashboard that’s great for managing short and quick everyday assignments.
Top features:
- Simple task management on a cardboard
- Creating unlimited task lists
- Image and file sharing
- Organizing lists by dates or priority
- Commenting and collaboration
What’s special about this tool: From startups to Fortune 500 companies, Trello is the most visual way for teams to collaborate on any project.
Pricing: Free for personal use, $9.99 user/month for businesses
Check out this Trello alternative!
10. Active Collab
Active Collab helps your team stay organized while you outgrow email.
Top features:
- Time tracking and invoicing
- Gantt-like timeline for planning
- Kanban cards
- Creating tasks with multiple users and deadlines
- A shared team calendar for collaboration
What’s interesting about this tool: Active Collab is especially great for collaboration, with functions like collaborative text editing and @mentions for communication.
Pricing: From $25/month for cloud version, from $499 for the self-hosted version
11. Redmine
Redmine is an open-source project management tool, made highly flexible by its volunteer community.
Top features:
- Gantt charts and calendar for planning
- News feed and document & file management
- Features for planning product roadmaps
- Email notifications
- Simple time tracking
What’s special about this tool: Redmine is an open-source tool and has multilanguage support which might become handy. However, to use this PM tool, you first need to download it.
Pricing: Free
12. Zoho Projects
Zoho Projects is one of the best-known tools for simple project management, that can help teams streamline their upcoming work and tasks.
Top features:
- Task lists with multiple tasks and milestones
- Time tracking and timesheets
- Gantt charts to oversee project progress
- Document and file management
What’s special about this tool: Zoho projects can be integrated with Zoho CRM and other tools to manage almost every aspect of your agency in one system.
Pricing: Up to 20 projects $25/month, unlimited projects $99/month; CRM and other additional features come with an extra price.
Check out this Zoho Alternative and 21 more best Zoho Alternatives for business management!
13. WorkBook
WorkBook is a software suite for project and resource management, CRM, collaboration and file sharing, forecasting & accounting.
Top features:
- Project and tasks lists
- Gantt charts
- Sales pipeline
- Client portal
- Financial features like budgets, forecasts, and automatic billing
What’s special about this tool: Not all clients have the same needs. WorkBook lets you choose exactly what modules that suit your needs and only pay for what you use.
Pricing: $19 user/month, minimum of 30 users
14. FunctionFox
FunctionFox has many helpful project management features, such as milestone tracking and budget comparison. It also has a nice user interface, making it pleasant to use.
Top features:
- Scheduling unlimited tasks and meetings
- Interactive real-time reporting
- Projects with sub-tasks and milestones
- Budget estimations
- To-do lists and time-tracking
What’s special about this tool: FunctionFox lets users create visual management dashboards that can be customized according to personal preferences. It’s a great way to get a quick overview of your upcoming work and your team’s results.
Pricing: From $5 user/month ($35/month for 1st user)
15. Nutcache
Nutcache is an all-in-one project management tool that includes time tracking and invoicing features. It was built for small teams that bill their clients on a project basis.
Top features:
- Project management and tasks
- Time tracking and time billing
- Expense management
- Linking projects and finished tasks to clients
What’s interesting about this tool: Nutcache has a good-looking user interface, excellent for team collaboration and simple project management.
Pricing: Free up to 20 users (limited features), $6 user/month for project management features, $15 user/month for unlimited features
16. WORKetc
WORKetc has integrated CRM, projects, billing, helpdesk, reporting, and collaboration.
Top features:
- Link timesheets, documents, discussions, notes, contacts and more to your projects
- Manage complex project budgets
- Automatically capture and invoice all revenue activities across all departments
- Use live support, web forms, and email to capture support tickets
What’s special about this tool: By integrating support cases directly inside of all areas of WORKetc, you can ensure the customer is always looked after. Suddenly your sales people are talking with your customer support people, and project issues can be assigned to the right person.
Pricing: From $49 user/month (first 3 users $65/month)
Check out this WORKetc alternative!
17. Cage
Cage is all about improving the way creative teams collaborate and work. It helps your team to manage projects, and have active discussions.
Top features:
- Manage and create projects
- Make notes and comments under tasks
- Keep track of all revisions
- Get approvals from clients
- Have video conversations
- Password protection for your projects
What’s special about this tool: Cage combines project management and efficient collaboration. You can plan projects and organize video calls by using this one PM tool.
Pricing: From $49/month for teams
18. Paymo
Paymo offers a simple yet powerful tool bringing together project management, work reporting, and time billing.
Top features:
- Tracking the time spent on tasks and projects
- Thorough work reports
- Dashboard to see your team’s performance
- Billing customers for completed tasks
- Integrated project accounting
What’s interesting about this tool: With Paymo Plus, you can automate your time tracking completely. All you need to do is download the desktop app, let it track your PC usage, and at the end of each day, categorize all your time entries.
Pricing: Free and paid plans from $9.56 user/month
19. Brightpod
Brightpod is a web-based project management & time tracking software for digital marketing & creative teams.
Top features:
- Projects with tasks, priorities, and milestones
- Editorial calendar
- Logging time under each task
- Individual dashboards for team members
- In-app communication and file-sharing
What’s special about this tool: When creating a project, you can use pre-set Pod templates for a faster set-up and customized project experience.
Pricing: From $29/month for 10 users
20. LiquidPlanner
LiquidPlanner is a collaboration tool that combines project management and time-tracking.
Top features:
- Estimating a realistic range of time to complete tasks
- Commenting on tasks and schedule
- Task-specific collaboration boards
- Adding notes to projects
What’s special about this tool: LiquidPlanner has an interesting methodology for project management – it helps teams to set realistic deadlines based on best-case and worst-case scenarios.
Pricing: From $39 user/month, billed annually
Everything about your business, one click away
21. Weekdone
Weekdone is a weekly reporting and goal-setting tool for small teams that enables managers and leaders to get a clear overview of both short- and long-term progress.
Top features:
- Weekly status reporting
- Quarterly Objectives and Key Results (OKRs)
- Graphical metrics dashboard
- Private 1-on-1 feedback
What’s special about this tool: When most project tools focus on either weekly status reporting or long-term goal-setting, Weekdone covers both of these. Employees can link their weekly tasks with quarterly objectives so that their work is focused on the right objectives.
Pricing: Free for small teams, from $49/month for larger teams
22. Bitrix24
Bitrix24 offers a complete suite of social collaboration, communication and management tools for your team.
Top features:
- Social intranet for internal communication
- Gantt charts
- Employee workload management
- Customer relationship management
- Telephone integration
What’s special about this tool: Bitrix24 has a large set of features, from traditional project management to integrated telephone and HR system, or internal email.
Pricing: Free plan, paid plans with more storage from $39/month
Check out this Bitrix24 Alternative!
23. Redbooth
Redbooth lets you manage your projects the way you want, with kanban boards or lists to organize tasks, and time tracking to see where your day goes. Or, if you’re not sure where to start, there’s a library of project templates to start your projects out in a click.
Top features:
- Simple project & task planning
- Shared virtual team workspaces
- HD video conferencing for collaboration
- Productivity reports for managers and team leaders
- iOS or Android applications
What’s special about this tool: Unlike most PM tools, Redbooth’s business package gives you everything you need to see and hear your team members. You’ll get the tools for unlimited high-definition video conferencing, direct messaging, voice calling, and business chat to stay on top of everyone’s schedule.
Pricing: From $5 user/month
24. Microsoft Project
Microsoft Project helps to streamline the project, resource, and portfolio management. This project tool is used by 20+ million users.
Top features:
- Project scheduling & costing
- Resource management
- Reporting & business intelligence
- Built-in project templates
- Project timelines
What’s special about this tool:
Pricing: From $30 month/user for cloud platform, from $1,159 for on-premise software (for one PC)
Check out this Microsoft Project alternative!
25. MindGenius (previously Barvas)
MindGenius is designed for businesses who want to increase personal, team, and organizational effectiveness. It helps you capture and visualize information easily, turning ideas into actionable project plans and tasks.
Dynamic views allow you to switch easily between, planning, Gantt chart, and tasks. Identify dependencies, milestones, constraints, and critical path.
Top features:
- Task management with task board
- Mind mapping tools
- Internal communication
- Shared workspace
What’s special about this tool: MindGenius offers a mind mapping feature that includes the fundamental facts, assumptions, and expectations that your stakeholders need to know and agree on.
Pricing: Different subscription and perpetual models.
26. ClickUp
ClickUp is a project management platform that’s focused on efficient task management. Built for teams of all sizes and industries, ClickUp’s fully customizable features make it a must-have for agile teams that want to keep everything from design to development in one intuitive place.
Top features:
- 3 different views (Board, Box, List)
- Assign comments
- 52 customizable features for each project (Statuses, Assignees, ClickUps)
- Elegant hierarchy to keep projects simple as they grow
- Tools like ‘Smart Search’ and ‘Smart Estimates’ make you more productive over time
What’s special about this tool: ClickUp’s beautiful design and unprecedented user experience in an otherwise dull space echoes what Slack did to communication.
Pricing: Free for up to 100MB, Premium for $5 user/month
27. Avaza
Avaza is a simple project management tool that lets you collaborate on projects with both your team and customers. Besides, you’ll be able to track your time and bill your customers.
Top features:
- Task management on a cardboard-style interface
- Automatic task reminders
- Flexible time tracking and timesheet approvals
- Sending quotes & invoices in moments
What’s special about this tool: Each project in Avaza has a user-friendly email address. Simply forward emails from your Avaza-registered email address to instantly convert these into tasks.
Pricing: Start free with up to 5 projects, $39.95 for unlimited projects
Read on: 16 Best Employee Timesheet Software for Efficient Time Management
28. Teamweek
Teamweek is a timeline-based project management tool that lets teams schedule their upcoming tasks and meetings into a shared calendar.
Top features:
- Simple project management
- Gantt-chart interface
- Drag-and-drop task management
- Scheduling work hour by hour
- Overseeing your team members’ availability
What’s special about this tool: Teamweek serves as an add-on to more comprehensive project management tools, making time-scheduling super easy. If you’re looking for a cool time planning tool, check it out!
Pricing: Free for up to 5 members, $39 for larger teams
29. 10,000ft Plans
10,000ft Plans is a visual project management application with strong features in resource planning and forecasting.
Top features:
- Resource management
- Project and task management
- Task delegation
- Project and resource matching
- Detailed project reporting
- Time tracking
What’s special about this tool: 10,000ft gives a broad overview of every project, making it easier to schedule, plan, and estimate the outcome. With a beautiful interface, this tool is suitable for creative agencies of all sizes.
Pricing: From $10 user/month
30. Teamwork Projects
Teamwork Projects enhances team collaboration and helps creative teams to organize their work and tasks.
Top features:
- Project planning on Gantt charts
- Time tracking and reporting
- Customizable features on each project
- Task lists with sub-tasks
- Milestone management
- Comprehensive user permissions
- Reporting
What’s special about this tool: Teamwork Projects is easy to use and packed with features. The tool integrates seamlessly with Teamwork.com’s other two products; Teamwork Desk and Teamwork Chat.
Pricing: From $49/month
31. Freedcamp
Freedcamp will help you, whether you have wedding plans, organizing a camping trip or leading a work project. Working from home or at the office.
Top features:
- Task lists & status management
- Shared team calendar
- Project templates
- Issue tracker
What’s special about this tool: Like sticky notes? You’re in luck! Freedcamp uses a kanban board with sticky notes to manage tasks.
Pricing: Free plan, paid add-ons
32. Advantage
Advantage is a project management software designed for a great user experience – clean interface and simple functionality.
Top features:
- Manage time, tasks, and expenses
- Automate and expedite work
- Manage media
- Manage prospect and client activities
- Get thorough reports and forecasts
What’s special about this tool: Advantage is most suitable for agencies.
Pricing: Upon request
33. Easy Project
Easy Project is easy, visual and intuitive project management software.
Top features:
- Gantt chart
- Risk management
- Portfolio management
- Project templates
What’s special about this tool: Easy Project is a fit for many different industries, from IT & software development to education or voluntary projects.
34. ProWorkflow
ProWorkflow makes it a breeze to assign staff, track time or reschedule projects.
Top features:
- Dashboard for an overview of your workload
- Allocate tasks
- View workload across teams
- Manage contacts
- Share files
- Manage invoices and quotes
What’s special about this tool: Convenient mobile application lets your track time, communicate, and complete tasks on the move.
Pricing: From $22 month/user for teams
Check out this ProWorkflow alternative!
35. Smartsheet
Smartsheet is excellent for managing and automating collaborative work.
Top features:
- Project plans and schedule
- Program rollups
- Resource management
- Budget tracking
- Strategic planning
What’s special about this tool: Smartsheet is trusted by over 50% of the Fortune 500.
Pricing: From $15 month/user for teams
Check out this Smartsheet alternative!
36. Celoxis
Celoxis offers comprehensive project management software for enterprises.
Top features:
- Advanced scheduling
- Gantt charts
- Project tracking
- Financial management
- Reporting analytics
What’s special about this tool: Depending on your team’s needs, Celoxis offers both SaaS and On-Premise options.
Pricing: From $25 user/month for cloud solution, $450/user for on-premise solution
37. Insightly
Insightly is a powerful CRM with a project and business management feature set.
Top features:
- Manage leads, contacts, organizations, partners, vendors and suppliers
- Track project activity and performance against milestones
- Look at your business any way you want with task dashboard, activity sets, reports and more
What’s special about this tool: Insightly CRM is tailored for any level of experience – from first time CRM users to sales experts.
Pricing: From $15 month/user for teams
38. Copper Project
Copper Project simplifies work processes as an affordable and invaluable executive tool, from Large multi-national projects to small home-based ventures.
Top features:
- Collaborative project and task views
- Project templates
- Task timers
- File sharing
What’s special about this tool: Copper offers simplicity in project resource management and communication.
Pricing: From $49/month
39. Clarizen
Clarizen‘s cloud-based project management software has a single goal: to help move your business forward.
Top features:
- Unlimited number of projects
- Automated and repeatable processes, alerts and workflows
- Social collaboration
- Budget tracking & expense management
What’s special about this tool: Clarizen offers configurable workflows – customize Clarizen to fit how your enterprise does business, not the opposite.
Pricing: From $60 user/month
40. ProjectManager.com
ProjectManager.com is a project planning software fully integrated with Google Apps, Microsoft Word, Excel and Project. From planning to tracking progress and reporting, it provides a full suite of tools for you to meet your project goals and manage your team.
Top features:
- Task management tools
- Gantt charts
- Project planner
- Timesheets
What’s special about this tool: ProjectManager.com is useful for remote teams as it lets you share and discuss projects online, create group discussions and invite team members to chat online or by mobile.
Pricing: From $15 user/month
41. Highrise
Highrise is the just-right, more thoughtful way to keep track of the people, conversations, and tasks that are the lifelines of your business
Top features:
- Store important emails
- Attach documents and files
- Control who sees what with easy privacy settings
- Keep track of important tasks
- Assign tasks to team members
What’s special about this tool: Highrise was designed to simplify your workflow, no more, no less – as simple as that!
Pricing: From $24/month for small teams, from $49/month for larger teams